- Cut team- precut all studs, trimmers, headers and blocking- need cut list
- Stairs- landing and stairs
- Wall material layout- Spread lumber in preparation for nailing
- Wall nailing- Check and nail all lumber in walls in preparation for sheeting
- Sheeting- square wall, sheet, tack and snap nailing lines and openings
- Sheeting nailing- nail sheeting, cut openings (shear wall strapping)
- Wall standing- Stands, plumb, line and secure
- Floor layout- Mark plates for all beams, joists, including hangers
- Floor cutters- cut beams, joists, blocks
- Beams- set all beams (most in first floor)
- Joists framing-
- Hardware installation- hold downs, hangers
- Exterior deck- posts, joists
- Exterior staircases- walls, landings stairs
- Subfloor installation